<?xml version="1.0" encoding="utf-8"?>
<feed xmlns="http://www.w3.org/2005/Atom">
  <title>MBWG Software blog</title>
  <link href="https://mbwgsoftware.com/blog/feed.xml" rel="self"/>
  <link href="https://mbwgsoftware.com/blog/"/>
  <id>https://mbwgsoftware.com/blog/</id>
  <updated>2026-10-26T00:00:00.000Z</updated>
  <author><name>MBWG Software Solutions</name></author>
  <entry>
    <title>Your incident response plan won&#39;t survive the first call</title>
    <link href="https://mbwgsoftware.com/blog/your-incident-response-plan-wont-survive-the-first-call/"/>
    <id>https://mbwgsoftware.com/blog/your-incident-response-plan-wont-survive-the-first-call/</id>
    <updated>2026-10-26T00:00:00.000Z</updated>
    <author><name>Matt Durant</name></author>
    <summary>Every incident response plan has a contact list or call tree. Very few of them survive past the first call.</summary>
    <content type="html">&lt;p&gt;Every incident response plan has a contact list or call tree.&lt;/p&gt;
&lt;p&gt;Very few of them survive past the first call.&lt;/p&gt;
&lt;p&gt;The plan said the CIO decides when to isolate the network. The CIO was on a plane. The backup approver was listed by a title nobody had held in two years. The phone numbers were in a document on the file share that was now encrypted.&lt;/p&gt;
&lt;p&gt;None of that showed up in the audit. The auditor checked that a plan existed, that it was reviewed annually, and that someone signed it. All true.&lt;/p&gt;
&lt;p&gt;A written plan proves you thought about an incident. It doesn&#39;t prove your organization can run one.&lt;/p&gt;
&lt;p&gt;Tabletop exercises are supposed to close that gap. Too often they&#39;re a slide deck, a facilitator reading a scenario, and a room agreeing they&#39;d &amp;quot;escalate to the appropriate team.&amp;quot; Everyone leaves feeling prepared. Nothing in the plan changes.&lt;/p&gt;
&lt;p&gt;The ones that help do a few things differently. They put the people who&#39;d actually be on the call in the room, not just their managers. They add inconvenient details: the decision-maker is unreachable, the backups are encrypted too, a reporter calls before legal does. They force decisions instead of open discussion, and they end with a list of enhancements for the plan, each with an owner.&lt;/p&gt;
&lt;p&gt;If your last tabletop ended with no changes to the plan, it probably wasn&#39;t hard enough.&lt;/p&gt;
&lt;p&gt;When did your team last practice an incident instead of documenting one? If the honest answer is &amp;quot;I&#39;m not sure,&amp;quot; &lt;a href=&quot;/about.html#contact&quot;&gt;send me a message&lt;/a&gt;. I&#39;ve spent a lot of time lately on making these exercises realistic without turning them into a months-long project, and I&#39;m happy to compare notes.&lt;/p&gt;
</content>
  </entry>
  <entry>
    <title>Our security POC passed</title>
    <link href="https://mbwgsoftware.com/blog/our-security-poc-passed/"/>
    <id>https://mbwgsoftware.com/blog/our-security-poc-passed/</id>
    <updated>2026-09-28T00:00:00.000Z</updated>
    <author><name>Matt Durant</name></author>
    <summary>We had a list of requirements. We were shown every feature on it. We spent a month going back and forth with legal, and we signed the order.</summary>
    <content type="html">&lt;p&gt;Our security POC passed.&lt;/p&gt;
&lt;p&gt;We had a list of requirements. We were shown every feature on it. We spent a month going back and forth with legal, and we signed the order.&lt;/p&gt;
&lt;p&gt;During implementation, we found that one of our core use cases had been removed from the product sometime between the POC and the rollout. Three years later, it still hasn&#39;t come back and we have to move on.&lt;/p&gt;
&lt;p&gt;Several other features turned out to be unworkable because of limitations that never surfaced during the POC.&lt;/p&gt;
&lt;p&gt;The POC did what it was designed to do. It just proved much less than we thought it did.&lt;/p&gt;
&lt;p&gt;A POC shows you the product in a few weeks, in a limited scope, often driven by the vendor&#39;s engineer. It doesn&#39;t show you the product you&#39;ll actually deploy, run by your own team, across your real environment.&lt;/p&gt;
&lt;p&gt;And that environment is where most rollouts stall. The IT person running the pilot is already carrying three other projects. Operations won&#39;t give you a change window for weeks. Nobody accounted for dozens of different sites. The alerts fire, and nobody has decided who answers them. A warehouse can&#39;t stop shipping so a vendor can spend another afternoon troubleshooting an agent.&lt;/p&gt;
&lt;p&gt;So before signing, I want answers to different questions:
Are the features we tested written into the contract, or just into the demo?
What breaks when we go from twenty test endpoints to every site we have?
Can our existing team operate this after the vendor leaves?
When something goes wrong, who realistically owns it?&lt;/p&gt;
&lt;p&gt;A passed POC doesn&#39;t prove the product works for you. It proves the demo worked.&lt;/p&gt;
&lt;p&gt;What&#39;s something you only discovered about a security product after you&#39;d signed?&lt;/p&gt;
</content>
  </entry>
  <entry>
    <title>Your agent-based security product doesn&#39;t work in a warehouse</title>
    <link href="https://mbwgsoftware.com/blog/your-agent-based-security-product-doesnt-work-in-a-warehouse/"/>
    <id>https://mbwgsoftware.com/blog/your-agent-based-security-product-doesnt-work-in-a-warehouse/</id>
    <updated>2026-09-21T00:00:00.000Z</updated>
    <author><name>Matt Durant</name></author>
    <summary>Most security tools assume every device can run an agent. Warehouses and plant floors break that assumption.</summary>
    <content type="html">&lt;p&gt;Your agent-based security product doesn&#39;t work in a warehouse.&lt;/p&gt;
&lt;p&gt;The terminal is bolted to a forklift. It runs an OS that went end-of-life five years ago, nobody can reboot it during a shift, and the agent won&#39;t install on it. There are thirty more like it in the building and the building is one of many.&lt;/p&gt;
&lt;p&gt;Most security tooling is built and tested in environments where everyone has an assigned device, a company phone, a network that is always up, and everything is reachable at all times. In warehousing and industrial environments, none of these conditions apply.&lt;/p&gt;
&lt;p&gt;Agent deployments assume a machine that can accept an agent. End-of-life operating systems are a fact of life, yet support for old OS versions tends to get dropped quickly. Agents are also architected to require constant communication with their console, even when they already have the configuration cached.&lt;/p&gt;
&lt;p&gt;When the forklift drives out of range, the agent doesn&#39;t fall back to the policy it already holds. It waits. Jobs queue on the console rather than the device and the dashboard reports it as unhealthy.&lt;/p&gt;
&lt;p&gt;Equipment designed for offline work ends up in a coverage gap that will never close. The tool reports that gap as an incomplete deployment, because it doesn&#39;t have a category for a supported device that will never take an agent.&lt;/p&gt;
&lt;p&gt;Identity and activity monitoring requires being able to attribute an action to a specific person or service. On a shared terminal, a login can stay open all shift, because signing in and out costs throughput. Logged actions resolve to a station rather than a person. Tracking an incident back to a person becomes an entirely manual effort. Traditional MFA requires a device that the worker carries, on a floor where phones are often not permitted.&lt;/p&gt;
&lt;p&gt;Automated patching assumes that a maintenance window exists. In a facility that runs on physical throughput, that window is a negotiation with operations. Updates get deferred, and the dashboard shows a growing number of out-of-date agents with no field to record that the delay was an accepted risk rather than a lapse.&lt;/p&gt;
&lt;p&gt;None of this is a complaint about vendors. Distribution, manufacturing, and logistics are targeted constantly and spend accordingly. They are not a marginal segment waiting to grow into these products. They are buying now, and they are buying tools that don&#39;t fit their environment because that&#39;s what&#39;s available.&lt;/p&gt;
&lt;p&gt;The gap isn&#39;t budget; it&#39;s that the people designing these products have never spent time in one of these buildings, so the assumptions baked into the architecture never get examined. A vendor who does that examination isn&#39;t designing for an edge case; they&#39;re entering a market where the incumbent products already don&#39;t work.&lt;/p&gt;
&lt;p&gt;Before running a pilot, here&#39;s what I want answered: what does it do when the site is offline for a week? Does it support my equipment running end-of-life operating systems? Does it support identity sourced somewhere other than the major directory providers?&lt;/p&gt;
</content>
  </entry>
</feed>
